Coming out of the ground, the forming work you see in the photo was completed in 6 hours, ready to pour.
Brick Ledge
Specific ICF brick ledge was installed on 3/4's of the building. All below grade walls have dimpleboard applied as a drainage plane, along with drain tile and bleeders, that is all that is needed below grade with commercial ICF in Wisconsin. In the south, termite barrier may need to be applied